R3

(redirected from R-3)

R3

The National Health Service Breast Screening Programme’s (UK) preferred abbreviation for a mammogram which is interpreted by a radiologist as indeterminate/probably benign.
Mentioned in ?
References in periodicals archive ?
Contract notice: cleaning service in common areas in housing promotions garcia grana protected r-1, r2, r-3, r-4 and r-5 municipal ownership and administered by the municipal housing institute
The story introduces the R-3 100 program, a list of 100 women who will likely be ready in three years to become general counsel.
It is zoned R-3 residential with a 50,000 square foot lot size and potential for a 7-lot subdivision.
(Note: All of the notations at the end of the paragraphs--R1, R2, R-3, etc.
Contract notice: service of counseling in public promotions of houses in garca grana (r-1, r-2, r-3, r-4 and r-5) of municipal ownership and administered by the municipal institute of housing of malaga
Request for quotations :Manometer thermometer tkp-160 r-3 2 (0-120) -2.
Request for quotations : purchase of services for the production of design and estimate documentation for the object overhaul of transit sections of the r-3 highway logoisk-zembin-glubokoe-border of the republic of latvia (urbany), (borisovskaya st.
Tenders are invited for Repair Routine Maint Of Electric Lifts Make-Escon Otis Bb Beacone Kone G-5 G-6 G-14 Storey Building F-3W F-4E Asha-1N Asha-2S Asha-3N Asha-4N 06 Ps Lifts Makar R-1 R-2 R-3 R-14 R-23 R-28 R-32 R-34 R-36 A Wing R-36 B Wing R-37 A Wing R-37 B Wing R-38 A Wing R-38 B Wing R-39 A Wing R-39 B Wing 8 And 13 Ps Lifts G Block H Block R-2 R-3 300 Sailors 2 Nos Lifts R-20 R-21 R-27 To R-35 08 Ps Lift R-10 Goods At Navy Nagar Colaba Mumbai
Tenders are invited for Supplectricy,Installation And Testing Including Civil Engineering Work Of Elally Driven 60000 Gph Head 36 Meter Complete Horizontal Split Case Centrifugal Pump Alongwith Suitable Capacity Tefc Type Squirrel Case Energy Efficient Induction Motor Self Starter With Panel Including Base Plate,Coupling And Coupling Guard,Fixing Bolt And Nuts As Per Enclosed Cee-Kkk S Specn.No.Cee-153 R-3 -2011 Clause No.3.0 And 4.0 Of Specn.No.Cee R-3 -2011 Are Not In Scope Of Supply.It Required,Suitable Reducter Is To Be Supplied In Case The Deliver-Suction Size Of The Pump In Different Without Any Extra Cost.