MC 2

MC2

 
Medical Corps.
References in periodicals archive ?
The contract will consist of a firm tranche and an optional tranche designated as follows: - firm phase: Phase of preparation and appropriation of previous studies, Pro (including mc 1, Mc 2, Mc 3, Mc 6 and mc 8), Optional slice 1: Act, Exe, Visa, Det and aor (including mc 3, Mc 4, Mc 5, Mc 7 and mc 9).
firm tranche: firm tranche deadline for the firm tranche: (see section ii.2.7) detail by tranche of the tasks entrusted to the holder: tf - firm tranche: esq / avp / mc1 / mc2 / mc3 / mc4 / mc5 to001 - optional tranche 1 : pro / mc 1 / mc2 / mc 3 / mc 4 / mc5 to002 - optional slice 2: act / mc 1 / mc 2 / mc 3 / mc 4 / mc 5 to003 - optional slice 3: det / visa / aor / mc 1 / mc 2 / mc 3 / mc 4 / mc 5.
the services entrusted to the holder consist of mission elements defined in Annex III to the Decree of 21 December 1993 - Mission AVP: studies before project - PRO Mission Studies Project - Mission ACT: assistance in drafting and contracting work - Mission VISA: Visa construction documents extended to the following additional tasks (Mc): - 1 mC public inquiry environmental codes and expropriation - mC 2 Water Act - clearing mC 3 - 4 mC classified site and historical monuments - 5 mC protected species