lethal multiple pterygium syndrome

(redirected from LMPS)
Also found in: Acronyms.

lethal multiple pterygium syndrome

,

LMPS

A rare, usually autosomal recessive disorder in which affected fetuses have joint contractures, skin webs that link adjacent body structures, cystic hygromas, and hydrops fetalis. Most affected fetuses do not survive.
Mentioned in ?
References in periodicals archive ?
The study aims to look at whether festivals influence recalled LMP dates, and to quantify the degree of variability between the gestational age by LMP and by dating ultrasound.
A new microencapsulation technology called Lipid Multi-Particulates (LMP) has repurposed a long-standing multi-active time-release concept from the pharmaceutical industry for health and nutrition.
Employees at all levels were featured in a series of Ignite talks, sharing examples of how the 10 LMPs can be incorporated into daily practice.
In this study, the O-H stretching band peaks of CON, NPS, and LMPS were located in 3280, 3277, and 3274 [cm.sup.-1] and the corresponding strength values were 0.76, 0.84, and 0.89, respectively.
Hence, we adjust the post-line LMP paid by node j consumers as follows:
Security Institute is there for all those people who need to have the best in security training," said Karim Hamdaoui, General Director of LMPS.
De este modo, salen sobrando los ECAs y los LMPs. ?Como es posible entonces, que la legislacion peruana de cabida a ambos tipos de instrumentos?
These antibodies could distinguish MPs derived from PMP, leucocytes (LMP), and EMP cells.
ISO by solving an optimization problem helps producers consumers and LMPs to make a decision.
Let [p.sub.t] be the price of electricity on the grid (known as a locational marginal price or LMP) at time t, which depends on the temperature [Q.sub.t] at time t (LMPs tend to be both higher, and a lot more volatile, at very low and very high temperatures).
(179) The agency's Locational Marginal Price (180) (LMPs) study showed that integrating renewable resources into the power grid lowered LMPs by $1.30 per megawatt-hour in 2011.