The
factory acceptance test, which has to be completed before the gas turbine can be delivered, was carried out at the Rolls-Royce Test Facility in Bristol.
The
factory acceptance test certificate was granted following two days of inspection and testing.
The
factory acceptance test was granted following two days of inspection and testing carried out by a senior team of ANA safety trainers and simulator engineers.
The
Factory Acceptance Test verified the system functionality and assembly.
The solution will encompass a full set of professional services, including design, documentation,
Factory Acceptance Test (FAT) and Integrated
Factory Acceptance Test (IFAT), together with on-site provisional acceptance services and commissioning.
M2 EQUITYBITES-July 21, 2016-UK-based EDM's door trainer for All Nippon Airways passes
factory acceptance testNorwegian air traffic management technology firm Indra Navia said it completed a successful
factory acceptance test for LVNL's new Garex voice communication and control system.
Era Corporation has completed a successful
Factory Acceptance Test (FAT) for the ADS-B and multilateration surveillance solution for Beijing Capital International Airport.
The main automation contractor provides satisfactory results during project execution while implementing automated control infrastructure life cycle, which includes the procurement of systems, engineering design,
factory acceptance tests, site acceptance tests, maintenance and start-up.