BIM

(redirected from BIMS)
Also found in: Dictionary, Acronyms, Idioms.

BIM

Abbreviation for:
beam intensity modulation
British Institute of Management (Medspeak-UK)
buffered isolation medium
References in periodicals archive ?
Figure 5 depicts the framework of energy management design using BIM.
So what is necessary to approach a world where a BIM exists for every building with each BIM including all the information necessary to simulate energy requirements, indoor air conditions, acoustical performance, and lighting along with the associated occupant and environmental impacts?
Brominated isobutylene-co-p-methylstyrene (BIMS) (grade: Exxpro [TM] 3035; benzylic bromine of 0.47 [+ or -] 0.05 mol% and 2.0 mol% of p-methylstyrene, Mooney viscosity of 45 [+ or -] 5 at ML1 + 8 125[degrees]C and [M.sub.w] = 450,000) and Escorez[TM] hydrocarbon resin (grade: E1102; softening point of 96-104[degrees]C; Glass transition temperature of 50[degrees]C; and [M.sub.w] = 2400) were supplied by Exxon Mobil Chemical Company, Baytown, TX.
Therefore, the development of three reference BIM models to serve as a standard for illustrating a BIM to a BES model information transfer was not achievable under the scope of this project.
For BC40 and BC80 Bims concrete classes, unlike the CEM I samples, the ACS values were decreased as the ash content increased in the CEM II samples.
More information about BIMS and the full schedule of activities and speakers is available here.
It is the collaborative elements involved in BIMs successful use that raise the most contractual uncertainty, particularly in an industry that is adversarial by nature and where participants are expectedly cautious about their own self interest.
LAHORE -- : After the successful roll-out of RIMS (Restaurant Invoice Monitoring System), Punjab Revenue Authority (PRA) has now developed Beauty Parlours Invoice Monitoring System (BIMS) which has been done in collaboration with the Punjab Information Technology Board.
He received an NJPEC award in 2005, and a BIMS award in 2007.
METHODS: Residents of an assisted living facility (N = 15) who scored from 8-12 on the Brief Inventory of Mental Status (BIMS) were recruited for this study, and randomly assigned to the intervention group (N = 8) or the control group (N - 7).