on-cost

on-cost

the supplementary costs, e.g. of a salary, include workers' compensation, leave loading, superannuation, payroll tax etc.
Mentioned in ?
References in periodicals archive ?
Instead, just-auto's analysts believe that most OEMs will have chosen the options that offer the greatest return in terms of CO2 reduction for the least on-cost.
He will be responsible for ensuring the assembly and delivery of on-time, on-quality and on-cost aircraft to customers.
John Harper, Project Manager said, DNV GL propose to work together with Maersk Oil UK as part of one integrated team with the view to helping delivering the project fully compliant, on-schedule and on-cost .
We can achieve a 15% save at less than $40 per percentage of on-cost," says Jeff Hemphill, vice president and chief technical officer of Schaeffler North America.
For maximum production flexibility and minimum on-cost, additional options can be retro-fitted at any time.
This latest contract award is a reflection of EADS North America's commitment to on-time, on-cost performance with the Lakota, a proven, flexible aircraft that is flying every day to meet the Army's mission," said Sean O'Keefe, EADS North America Chairman and CEO.
As a key partner on this program, Banneker's supply chain management and support has been instrumental in keeping our high-performing program on-cost and on-schedule as we continue to deliver on our commitments to our customer.
The project aims to demonstrate the potential of using high-speed flywheel technologies -- including both Kinergy and competitor systems -- in delivering hybrid systems with the potential for 30 per cent fuel savings (and equivalent reductions in CO2 emissions) at an on-cost of below Au1000 ($1,575), thus enabling the mass-market uptake of hybrid vehicles in price-sensitive vehicle applications.
According to the same analysis, the on-cost for the buildings to achieve 'LEED Gold' ranges from an additional 1 per cent to 3 per cent depending on the building type; however, if sustainable design is integrated into the project from the start, additional on-costs for sustainability can be lowered.
Oxo-biodegradable plastic can be made with the same machinery and workforce as ordinary plastic so there is no need to disrupt the supply chain and little or no on-cost.
No assertions about on-time, on-cost, which are always unconvincing simply because you have mentioned them.
Project predictability in the sector improved with those projects on-cost or better, rising from 43% last year to 48% in 2007.